WORKING / DEPLOYED
Sample data

Solution

Interventions

Approve records a human decision for water and energy only. Carbon is derived. Waste and procurement remain roadmap previews. Level 3 remains locked.

SAMPLE DATA MODE

  1. 01 Data

    What is happening?

  2. 02 Analysis

    What is wrong and why?

  3. 03 Solution

    What should be done?

  4. 04 Impact

    What changed and can we prove it?

Data context

Organisation
NEXUS Reference Portfolio
Site
Portfolio · 4 Reference Facilities
Building
4 Reference Facilities
Location
Dubai, UAE
Asset
Portfolio view
Data source / Meter
NEXUS Simulator
Metric
Energy · Water
Unit
kW · L/hr
Resolution
Site to asset / zone
Data quality
HIGH — SAMPLE
Integration
Simulated — No live BMS / IoT
Data mode
Sample

Active operational cases

Water and energy

CRITICALWater AI
Site
Business Bay HQ · BB-HQ
Building / asset
WR-L18 — L18 domestic water riser
Data source
SM1182 · L18 water sub-meter
Metric
Water Flow · L/hr
Sample / real status
SAMPLE DATA

Abnormal overnight flow detected at Business Bay HQ.

Avoidable loss
1,840 L/day
Confidence
96%
Observed
3,842 L/hr
Expected
2,210 L/hr

DETECTED

View evidence
HIGHEnergy AI
Site
Business Bay HQ · BB-HQ
Building / asset
CH-Z4 — Zone 4 cooling plant
Data source
SM2044 · Floor energy meter
Metric
Energy · kWh
Sample / real status
SAMPLE DATA

Cooling demand is 21% above predicted requirement.

Potential annual value
AED 4,180
POTENTIAL IMPACT · NOT YET ACHIEVED
Confidence
94%
Observed
178 kWh
Expected
143 kWh

INVESTIGATING

View evidence
MEDIUMEnergy AI
Site
Business Bay HQ · BB-HQ
Building / asset
SITE LEVEL
Data source
NEXUS Simulator
Metric
Energy · kWh
Sample / real status
SAMPLE DATA

Perimeter lighting at Business Bay remaining at occupied output after 20:00 GST.

Potential annual value
AED 2,400
POTENTIAL IMPACT · NOT YET ACHIEVED
Confidence
91%
Observed
18 kWh after close
Expected
6 kWh after close

DETECTED

View evidence
MEDIUMEnergy AI
Site
Al Quoz Warehouse · AQ-WH
Building / asset
SITE LEVEL
Data source
NEXUS Simulator
Metric
Energy · kWh
Sample / real status
SAMPLE DATA

Warehouse extract fans at Al Quoz running through the unoccupied afternoon window.

Potential annual value
AED 3,150
POTENTIAL IMPACT · NOT YET ACHIEVED
Confidence
88%
Observed
22 kWh afternoon
Expected
7 kWh afternoon

DETECTED

View evidence
HIGHEnergy AI
Site
JLT Operations Centre · JLT-OC
Building / asset
AHU-07 — AHU-07
Data source
NEXUS Simulator
Metric
Energy · kWh
Sample / real status
SAMPLE DATA

Air handling unit AHU-07 remaining in occupied mode after close.

Confidence
92%
Observed
64 kWh overnight
Expected
18 kWh overnight

DETECTED

View evidence

Derived impact observations

DERIVED CARBON IMPACT

DERIVEDCARBON IMPACT
Site
Dubai South Facility · DS-FC
Building / asset
GEN-01 — Standby generator G-01
Data source
NEXUS Simulator
Metric
Idle hours · hours
Sample / real status
SAMPLE DATA

Standby generator at Dubai South idling outside the test window.

Confidence
89%
Observed
2.4 hours idle
Expected
0.4 hour test window

DERIVED CARBON IMPACT

ROADMAP PREVIEW

Waste and procurement

PREVIEW ONLYProcurement AINOT A COMMISSIONED INTELLIGENCE DOMAIN
Site
Al Quoz Warehouse · AQ-WH
Building / asset
SITE LEVEL
Data source
NEXUS Simulator
Metric
Procurement · units
Sample / real status
SAMPLE DATA

High-impact single-use material detected in purchase request.

Confidence
87%
Observed
PR-88421 · 12,000 units PET clamshell
Expected
Reusable or recycled-content equivalent

ROADMAP PREVIEW

PREVIEW ONLYWaste AINOT A COMMISSIONED INTELLIGENCE DOMAIN
Site
Al Quoz Warehouse · AQ-WH
Building / asset
WB-03 — Weighbridge WB-03
Data source
WB-03 · Weighbridge
Metric
Contamination · %
Sample / real status
SAMPLE DATA

Recyclables stream at Al Quoz showing a 19-point contamination increase.

Confidence
84%
Observed
41% contamination
Expected
22% contamination

ROADMAP PREVIEW