WORKING / DEPLOYED
Sample data

Impact

Verified Impact Ledger

Verification register. Each record is an environmental evidence certificate. Sample records are not actual customer savings.

SAMPLE DATA MODE

  1. 01 Data

    What is happening?

  2. 02 Analysis

    What is wrong and why?

  3. 03 Solution

    What should be done?

  4. 04 Impact

    What changed and can we prove it?

Data context

Organisation
NEXUS Reference Portfolio
Site
Portfolio · 4 Reference Facilities
Building
4 Reference Facilities
Location
Dubai, UAE
Asset
Portfolio view
Data source / Meter
NEXUS Simulator
Metric
Energy · Water
Unit
kW · L/hr
Resolution
Site to asset / zone
Data quality
HIGH — SAMPLE
Integration
Simulated — No live BMS / IoT
Data mode
Sample

Verified financial

AED 52,450

REFERENCE PORTFOLIO IMPACT

Records

6

Data class

Sample records

SAMPLE DATA

NOT ACTUAL CUSTOMER SAVINGS

NX-000192

Cooling schedule corrected

Business Bay HQ

VERIFIEDSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Cooling schedule corrected

Business Bay HQ · Smart Meter SM2044

  1. 01 Before

    178 kWh/day

  2. 02 Action

    Cooling schedule corrected

  3. 03 After

    149 kWh/day

  4. 04 Verified result

    AED 4,760

Reduction
10,585 kWh avoided · 1.70 tCO₂e avoided
Financial impact
AED 4,760
Evidence
Smart Meter SM2044
Confidence
93%

NOT ACTUAL CUSTOMER SAVINGS

Site
Business Bay HQ
Problem
Cooling schedule corrected
Data source
Smart Meter SM2044
Baseline
178 kWh/day
Solution / intervention
Cooling schedule corrected
Before
178 kWh/day
After
149 kWh/day
Impact
AED 4,760
Evidence
Smart Meter SM2044
Confidence
93%
Verification status
VERIFIED
Sample / real status
SAMPLE DATA

NX-000188

Night-flush valve isolated

JLT Operations Centre

VERIFIEDSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Night-flush valve isolated

JLT Operations Centre · Sub-meter SM0881

  1. 01 Before

    1,960 L/hr overnight

  2. 02 Action

    Night-flush valve isolated

  3. 03 After

    410 L/hr overnight

  4. 04 Verified result

    AED 9,840

Reduction
1.24M L avoided · 0.42 tCO₂e avoided
Financial impact
AED 9,840
Evidence
Sub-meter SM0881
Confidence
95%

NOT ACTUAL CUSTOMER SAVINGS

Site
JLT Operations Centre
Problem
Night-flush valve isolated
Data source
Sub-meter SM0881
Baseline
1,960 L/hr overnight
Solution / intervention
Night-flush valve isolated
Before
1,960 L/hr overnight
After
410 L/hr overnight
Impact
AED 9,840
Evidence
Sub-meter SM0881
Confidence
95%
Verification status
VERIFIED
Sample / real status
SAMPLE DATA

NX-000164

LED retrofit, loading bays

Dubai South Facility

VERIFIEDSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

LED retrofit, loading bays

Dubai South Facility · Lighting circuit LC-12

  1. 01 Before

    41 kWh/night

  2. 02 Action

    LED retrofit, loading bays

  3. 03 After

    18 kWh/night

  4. 04 Verified result

    AED 12,600

Reduction
8,395 kWh avoided · 1.35 tCO₂e avoided
Financial impact
AED 12,600
Evidence
Lighting circuit LC-12
Confidence
97%

NOT ACTUAL CUSTOMER SAVINGS

Site
Dubai South Facility
Problem
LED retrofit, loading bays
Data source
Lighting circuit LC-12
Baseline
41 kWh/night
Solution / intervention
LED retrofit, loading bays
Before
41 kWh/night
After
18 kWh/night
Impact
AED 12,600
Evidence
Lighting circuit LC-12
Confidence
97%
Verification status
VERIFIED
Sample / real status
SAMPLE DATA

NX-000201

AHU-07 unoccupied restore

JLT Operations Centre

VERIFIEDSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

AHU-07 unoccupied restore

JLT Operations Centre · AHU-07 energy channel

  1. 01 Before

    64 kWh overnight

  2. 02 Action

    Unoccupied setback restored

  3. 03 After

    18 kWh overnight

  4. 04 Verified result

    AED 6,900

Reduction
16,820 kWh avoided · 2.70 tCO₂e avoided
Financial impact
AED 6,900
Evidence
AHU-07 energy channel
Confidence
92%

NOT ACTUAL CUSTOMER SAVINGS

Site
JLT Operations Centre
Problem
AHU-07 unoccupied restore
Data source
AHU-07 energy channel
Baseline
64 kWh overnight
Solution / intervention
Unoccupied setback restored
Before
64 kWh overnight
After
18 kWh overnight
Impact
AED 6,900
Evidence
AHU-07 energy channel
Confidence
92%
Verification status
VERIFIED
Sample / real status
SAMPLE DATA

NX-000218

Cooling-tower make-up trimmed

Business Bay HQ

VERIFIEDSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Cooling-tower make-up trimmed

Business Bay HQ · Make-up meter MU-02

  1. 01 Before

    920 L/hr make-up

  2. 02 Action

    Blowdown setpoint corrected

  3. 03 After

    610 L/hr make-up

  4. 04 Verified result

    AED 11,200

Reduction
671,600 L avoided · 0.23 tCO₂e avoided
Financial impact
AED 11,200
Evidence
Make-up meter MU-02
Confidence
90%

NOT ACTUAL CUSTOMER SAVINGS

Site
Business Bay HQ
Problem
Cooling-tower make-up trimmed
Data source
Make-up meter MU-02
Baseline
920 L/hr make-up
Solution / intervention
Blowdown setpoint corrected
Before
920 L/hr make-up
After
610 L/hr make-up
Impact
AED 11,200
Evidence
Make-up meter MU-02
Confidence
90%
Verification status
VERIFIED
Sample / real status
SAMPLE DATA

NX-000241

Generator warm-idle ended

Dubai South Facility

VERIFIEDSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Generator warm-idle ended

Dubai South Facility · Generator log G-01

  1. 01 Before

    2.4 hours idle / week

  2. 02 Action

    Test window locked to 25 minutes

  3. 03 After

    0.4 hours / week

  4. 04 Verified result

    AED 7,150

Reduction
4.80 tCO₂e avoided
Financial impact
AED 7,150
Evidence
Generator log G-01
Confidence
89%

NOT ACTUAL CUSTOMER SAVINGS

Site
Dubai South Facility
Problem
Generator warm-idle ended
Data source
Generator log G-01
Baseline
2.4 hours idle / week
Solution / intervention
Test window locked to 25 minutes
Before
2.4 hours idle / week
After
0.4 hours / week
Impact
AED 7,150
Evidence
Generator log G-01
Confidence
89%
Verification status
VERIFIED
Sample / real status
SAMPLE DATA

NX-000176

Break-pack bin split

Al Quoz Warehouse

MEASURINGSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAMEASURING

Break-pack bin split

Al Quoz Warehouse · Weighbridge WB-03

  1. 01 Before

    38% contamination

  2. 02 Action

    Break-pack bin split

  3. 03 After

    24% contamination

  4. 04 Verified result

    AED 4,200

Reduction
3.10 tCO₂e avoided
Financial impact
AED 4,200
Evidence
Weighbridge WB-03
Confidence
81%

NOT ACTUAL CUSTOMER SAVINGS

Site
Al Quoz Warehouse
Problem
Break-pack bin split
Data source
Weighbridge WB-03
Baseline
38% contamination
Solution / intervention
Break-pack bin split
Before
38% contamination
After
24% contamination
Impact
AED 4,200
Evidence
Weighbridge WB-03
Confidence
81%
Verification status
MEASURING
Sample / real status
SAMPLE DATA

NX-000151

Irrigation schedule tightened

Business Bay HQ

UNVERIFIEDSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAUNVERIFIED

Irrigation schedule tightened

Business Bay HQ · Irrigation controller IC-04

  1. 01 Before

    6,400 L/day landscape

  2. 02 Action

    Irrigation schedule tightened

  3. 03 After

    Pending post-measure

  4. 04 Verified result

    AED —

Reduction
Pending
Financial impact
AED —
Evidence
Irrigation controller IC-04
Confidence
74%

NOT ACTUAL CUSTOMER SAVINGS

Site
Business Bay HQ
Problem
Irrigation schedule tightened
Data source
Irrigation controller IC-04
Baseline
6,400 L/day landscape
Solution / intervention
Irrigation schedule tightened
Before
6,400 L/day landscape
After
Pending post-measure
Impact
AED —
Evidence
Irrigation controller IC-04
Confidence
74%
Verification status
UNVERIFIED
Sample / real status
SAMPLE DATA

NX-000140

Single-use catering swap trial

JLT Operations Centre

REJECTEDSAMPLE DATA

VERIFIED SAMPLE IMPACT

SAMPLE DATAREJECTED

Single-use catering swap trial

JLT Operations Centre · Procurement log PR-77110

  1. 01 Before

    PET units 4,200/month

  2. 02 Action

    Reusable service trial

  3. 03 After

    No statistically valid window

  4. 04 Verified result

    AED —

Reduction
Insufficient evidence
Financial impact
AED —
Evidence
Procurement log PR-77110
Confidence
41%

NOT ACTUAL CUSTOMER SAVINGS

Site
JLT Operations Centre
Problem
Single-use catering swap trial
Data source
Procurement log PR-77110
Baseline
PET units 4,200/month
Solution / intervention
Reusable service trial
Before
PET units 4,200/month
After
No statistically valid window
Impact
AED —
Evidence
Procurement log PR-77110
Confidence
41%
Verification status
REJECTED
Sample / real status
SAMPLE DATA