WORKING / DEPLOYED
Sample data

Solution

Recommended Solutions

Prioritised actions generated from NEXUS environmental analysis.

SAMPLE DATA MODE

  1. 01 Data

    What is happening?

  2. 02 Analysis

    What is wrong and why?

  3. 03 Solution

    What should be done?

  4. 04 Impact

    What changed and can we prove it?

SAMPLE POTENTIAL

Data context

Organisation
NEXUS Reference Portfolio
Site
Portfolio · 4 Reference Facilities
Building
4 Reference Facilities
Location
Dubai, UAE
Asset
Portfolio view
Data source / Meter
NEXUS Simulator
Metric
Energy · Water
Unit
kW · L/hr
Resolution
Site to asset / zone
Data quality
HIGH — SAMPLE
Integration
Simulated — No live BMS / IoT
Data mode
Sample

Active operational solutions

Water and energy

water

Abnormal overnight flow

Business Bay HQ · Water AI

Potential impact

AED 11,200

POTENTIAL IMPACT · NOT YET ACHIEVED

Site

Business Bay HQ

Problem

Sustained flow after occupancy collapse. Pattern matches a bypassed isolation valve on the L18 riser.

Analysis

Continuous abnormal flow +73.8% above baseline

Recommended action

Inspect and isolate the L18 domestic water-riser area, confirm the source of abnormal flow, take appropriate corrective action after investigation and measure post-action flow against the baseline.

Why

Sustained flow after occupancy collapse. Pattern matches a bypassed isolation valve on the L18 riser.

Priority

Critical

Responsible role

Facility / Maintenance Team

Approval

Human approval required

Measurement plan

Compare post-action flow with 2,210 L/hr baseline.

Status

Awaiting decision / Recommended

Potential impact

AED 11,200

Data source

NEXUS Simulator

SAMPLE / SIMULATED DATA · NOT ACTUAL CUSTOMER SAVINGS

energy

Excess cooling detected

Business Bay HQ · Energy AI

Potential impact

AED 4,180

POTENTIAL IMPACT · NOT YET ACHIEVED

Site

Business Bay HQ

Problem

Zone cooling continues despite low occupancy.

Analysis

Zone cooling continues despite low occupancy. +24.5%

Recommended action

Reduce Zone 4 cooling operation between 15:00–17:30.

Why

Zone cooling continues despite low occupancy.

Priority

High

Responsible role

Facility / Maintenance Team

Approval

Human approval required

Measurement plan

Compare post-action demand against expected load

Status

Recommended

Potential impact

AED 4,180

Data source

NEXUS Simulator

SAMPLE / SIMULATED DATA · NOT ACTUAL CUSTOMER SAVINGS

energy

Perimeter lighting after close

Business Bay HQ · Energy AI

Potential impact

AED 2,400

POTENTIAL IMPACT · NOT YET ACHIEVED

Site

Business Bay HQ

Problem

Photocell override left in manual after weekend cleaning.

Analysis

Photocell override left in manual after weekend cleaning. +200%

Recommended action

Restore photocell control on circuits L-P1 to L-P4.

Why

Photocell override left in manual after weekend cleaning.

Priority

MEDIUM

Responsible role

Facility / Maintenance Team

Approval

Human approval required

Measurement plan

Compare post-action demand against expected load

Status

Recommended

Potential impact

AED 2,400

Data source

NEXUS Simulator

SAMPLE / SIMULATED DATA · NOT ACTUAL CUSTOMER SAVINGS

energy

Extract fans in unoccupied mode

Al Quoz Warehouse · Energy AI

Potential impact

AED 3,150

POTENTIAL IMPACT · NOT YET ACHIEVED

Site

Al Quoz Warehouse

Problem

Interlock with dock doors not returning to setback.

Analysis

Interlock with dock doors not returning to setback. +214%

Recommended action

Restore extract setback between 13:00–16:00 when dock occupancy is below 20%.

Why

Interlock with dock doors not returning to setback.

Priority

MEDIUM

Responsible role

Facility / Maintenance Team

Approval

Human approval required

Measurement plan

Compare post-action demand against expected load

Status

Recommended

Potential impact

AED 3,150

Data source

NEXUS Simulator

SAMPLE / SIMULATED DATA · NOT ACTUAL CUSTOMER SAVINGS

energy

Idle AHU overnight run

JLT Operations Centre · Energy AI

Potential impact

AED 6,900

POTENTIAL IMPACT · NOT YET ACHIEVED

Site

JLT Operations Centre

Problem

Schedule exception left in place after weekend event.

Analysis

Schedule exception left in place after weekend event. +255%

Recommended action

Restore the weekday unoccupied setback on AHU-07 from 20:00 GST.

Why

Schedule exception left in place after weekend event.

Priority

High

Responsible role

Facility / Maintenance Team

Approval

Human approval required

Measurement plan

Compare post-action demand against expected load

Status

Recommended

Potential impact

AED 6,900

Data source

NEXUS Simulator

SAMPLE / SIMULATED DATA · NOT ACTUAL CUSTOMER SAVINGS

Derived impact observations

DERIVED CARBON IMPACT

DERIVED FROM VERIFIED SAMPLE ENERGY / WATER DATA. Not an independent active AI agent.

carbon

DERIVED

Generator warm-idle beyond window

Dubai South Facility · CARBON IMPACT

Potential impact

AED 7,150

POTENTIAL IMPACT · NOT YET ACHIEVED

View derived impact

Site

Dubai South Facility

Problem

Manual test left running after weekly generator check.

Analysis

Manual test left running after weekly generator check. +2.0 hours

Recommended action

End idle and lock the weekly test to a 25-minute supervised window.

Why

Manual test left running after weekly generator check.

Priority

MEDIUM

Responsible role

Facility / Maintenance Team

Approval

Human approval required

Measurement plan

Compare post-action demand against expected load

Status

Recommended

Potential impact

AED 7,150

Data source

NEXUS Simulator

SAMPLE / SIMULATED DATA · NOT ACTUAL CUSTOMER SAVINGS

ROADMAP PREVIEW

Waste and procurement

NOT A COMMISSIONED INTELLIGENCE DOMAIN

procurement

PREVIEW ONLYNOT A COMMISSIONED INTELLIGENCE DOMAIN

High-impact single-use material

Al Quoz Warehouse · Procurement AI

Potential impact

AED 18,400

POTENTIAL IMPACT · NOT YET ACHIEVED

View roadmap preview

Site

Al Quoz Warehouse

Problem

Catalogue default selected without an alternative comparison.

Analysis

Catalogue default selected without an alternative comparison. High impact / low necessity

Recommended action

Roadmap preview only. Not a commissioned intervention.

Why

Catalogue default selected without an alternative comparison.

Priority

MEDIUM

Responsible role

Facility / Maintenance Team

Approval

Human approval required

Measurement plan

Compare post-action demand against expected load

Status

Recommended

Potential impact

AED 18,400

Data source

NEXUS Simulator

SAMPLE / SIMULATED DATA · NOT ACTUAL CUSTOMER SAVINGS

waste

PREVIEW ONLYNOT A COMMISSIONED INTELLIGENCE DOMAIN

Contamination spike on mixed recyclables

Al Quoz Warehouse · Waste AI

Potential impact

AED 9,600

POTENTIAL IMPACT · NOT YET ACHIEVED

View roadmap preview

Site

Al Quoz Warehouse

Problem

Break-pack station mixing food-soiled film with cardboard.

Analysis

Break-pack station mixing food-soiled film with cardboard. +19 pts

Recommended action

Roadmap preview only. Not a commissioned intervention.

Why

Break-pack station mixing food-soiled film with cardboard.

Priority

MEDIUM

Responsible role

Facility / Maintenance Team

Approval

Human approval required

Measurement plan

Compare post-action demand against expected load

Status

Recommended

Potential impact

AED 9,600

Data source

NEXUS Simulator

SAMPLE / SIMULATED DATA · NOT ACTUAL CUSTOMER SAVINGS