Evidence chain for each verified sample record. Data, action, before/after and verification status.

SAMPLE DATA MODE

  1. 01 Data

    What is happening?

  2. 02 Analysis

    What is wrong and why?

  3. 03 Solution

    What should be done?

  4. 04 Impact

    What changed and can we prove it?

Data context

Organisation
NEXUS Reference Portfolio
Site
Portfolio · 4 Reference Facilities
Building
4 Reference Facilities
Location
Dubai, UAE
Asset
Portfolio view
Data source / Meter
NEXUS Simulator
Metric
Energy · Water
Unit
kW · L/hr
Resolution
Site to asset / zone
Data quality
HIGH — SAMPLE
Integration
Simulated — No live BMS / IoT
Data mode
Sample

NX-000192

VERIFIEDSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

Cooling schedule corrected

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Cooling schedule corrected

Business Bay HQ · Smart Meter SM2044

  1. 01 Before

    178 kWh/day

    ↓

  2. 02 Action

    Cooling schedule corrected

    ↓

  3. 03 After

    149 kWh/day

    ↓

  4. 04 Verified result

    AED 4,763

Reduction
10,585 kWh avoided · 4.28 tCO₂e avoided
Financial impact
AED 4,763
Evidence
Smart Meter SM2044
Confidence
93%
How this was calculatedShow working

Sample record. Quantities come from the sample meter window; values are derived as shown.

  1. 1. Energy avoided per year

    29 kWh/day × 365 days

    = 10,585 kWh

  2. 2. Financial value

    10,585 kWh × 0.45 AED/kWh

    = AED 4,763

  3. 3. Carbon avoided

    10,585 kWh × 0.4041 kgCO₂e/kWh ÷ 1,000

    = 4.28 tCO₂e

Assumptions used

  • Electricity rate: 0.45 AED / kWhSample assumptionIllustrative sample rate. Not a published tariff. Replace with the site's billed rate.
  • Grid electricity emission factor (Dubai): 0.4041 kgCO₂e / kWhPublished referenceDEWA Sustainability Report 2020, as indexed by Climatiq (AR4). Reference value from a 2020 publication. Confirm against DEWA's latest published factor before any real inventory.

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
Business Bay HQ · BB-HQ
Asset
CH-Z4 — Zone 4 cooling plant
Source ID
SM2044 · Floor energy meter
Source type
SMART METER / SIMULATED METER
Data quality
HIGH — SAMPLE
Detection resolution
ASSET / ZONE
Data limitation
Sample stream only. No live BMS or IoT connectivity.
Baseline window
7-day window
Intervention
Cooling schedule corrected
Measurement window
7-day window
Before
178 kWh/day
After
149 kWh/day
Unit
Demand · kWh/day
Verification status
VERIFIED
Evidence
Smart Meter SM2044

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Annualised from the 7-day sample meter window. AED uses the sample electricity rate; carbon uses the referenced Dubai grid factor. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency / asset-level M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    Zone 4 cooling 24.5% above expected.

  2. 02

    ANALYTICS

    Baseline locked at 178 kWh/day from SM2044.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    NEXUS recommended 15:00–17:30 setback.

  5. 05

    APPROVAL

    Operator approved. Execution pending BMS write.

  6. 06

    ACTION

    Schedule corrected on-site by facilities.

  7. 07

    MEASUREMENT

    Seven-day mean 149 kWh/day.

  8. 08

    VERIFICATION

    Window closed. 29 kWh/day avoided holds.

  9. 09

    IMPACT RECORD

    Impact record written to the ledger after verification.

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
Business Bay HQ · BB-HQ
Asset
CH-Z4 — Zone 4 cooling plant
Source ID
SM2044 · Floor energy meter
Source type
SMART METER / SIMULATED METER
Metric
Demand · kWh/day
Data quality
HIGH — SAMPLE
Detection resolution
ASSET / ZONE
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
Energy Baseline Engine
AI role
Interpretation / Prioritisation

Data limitation

  • Sample stream only. No live BMS or IoT connectivity.

NX-000188

VERIFIEDSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

Night-flush valve isolated

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Night-flush valve isolated

JLT Operations Centre · Sub-meter SM0881

  1. 01 Before

    15,680 L/night

    ↓

  2. 02 Action

    Night-flush valve isolated

    ↓

  3. 03 After

    3,280 L/night

    ↓

  4. 04 Verified result

    AED 36,208

Reduction
4.53M L avoided
Financial impact
AED 36,208
Evidence
Sub-meter SM0881
Confidence
95%
How this was calculatedShow working

Sample record. Quantities come from the sample meter window; values are derived as shown.

  1. 1. Water avoided per year

    (15,680 − 3,280) L/night × 365 nights

    = 4,526,000 L

  2. 2. Volume in cubic metres

    4,526,000 L ÷ 1,000

    = 4,526.0 m³

  3. 3. Financial value

    4,526.0 m³ × 8.00 AED/m³

    = AED 36,208

  4. 4. Carbon avoided

    Not calculated — no confirmed water emission factor

    = —

Assumptions used

  • Water rate: 8 AED / m³Sample assumptionIllustrative sample rate. Not a published tariff. Replace with the site's billed rate.
  • Water supply emission factor: noneNot availableNo confirmed published factor located. Carbon is not calculated for water records until a confirmed factor is supplied.

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
JLT Operations Centre · JLT-OC
Asset
SITE LEVEL
Source ID
SM0881 · Overnight water meter
Source type
SMART METER / SIMULATED METER
Data quality
HIGH — SAMPLE
Detection resolution
BUILDING / SITE
Data limitation
Site-level monthly data cannot localise the cause to a specific asset.
Baseline window
14-day window
Intervention
Night-flush valve isolated
Measurement window
14-day window
Before
15,680 L/night
After
3,280 L/night
Unit
Water Flow · L/hr
Verification status
VERIFIED
Evidence
Sub-meter SM0881

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Annualised from the 14-day sample overnight meter window. AED uses the sample water rate. Carbon not calculated: no confirmed water emission factor. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    Overnight residual failed to collapse with occupancy.

  2. 02

    ANALYTICS

    Baseline 15,680 L/night on SM0881.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    Isolation of night-flush valve recommended.

  5. 05

    APPROVAL

    Facilities approved isolation.

  6. 06

    ACTION

    Valve isolated and tagged.

  7. 07

    MEASUREMENT

    Fourteen-day mean 3,280 L/night.

  8. 08

    VERIFICATION

    Avoided overnight volume holds.

  9. 09

    IMPACT RECORD

    Impact record written to the ledger after verification.

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
JLT Operations Centre · JLT-OC
Asset
SITE LEVEL
Source ID
SM0881 · Overnight water meter
Source type
SMART METER / SIMULATED METER
Metric
Water Flow · L/hr
Data quality
HIGH — SAMPLE
Detection resolution
BUILDING / SITE
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
Water Analytics Engine
AI role
Interpretation / Prioritisation

Data limitation

  • Site-level monthly data cannot localise the cause to a specific asset.
  • Additional sub-meter or BMS data is required to identify the responsible asset.
  • Sample stream only. No live BMS or IoT connectivity.

NX-000164

VERIFIEDSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

LED retrofit, loading bays

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

LED retrofit, loading bays

Dubai South Facility · Lighting circuit LC-12

  1. 01 Before

    41 kWh/night

    ↓

  2. 02 Action

    LED retrofit, loading bays

    ↓

  3. 03 After

    18 kWh/night

    ↓

  4. 04 Verified result

    AED 3,778

Reduction
8,395 kWh avoided · 3.39 tCO₂e avoided
Financial impact
AED 3,778
Evidence
Lighting circuit LC-12
Confidence
97%
How this was calculatedShow working

Sample record. Quantities come from the sample meter window; values are derived as shown.

  1. 1. Energy avoided per year

    23 kWh/day × 365 days

    = 8,395 kWh

  2. 2. Financial value

    8,395 kWh × 0.45 AED/kWh

    = AED 3,778

  3. 3. Carbon avoided

    8,395 kWh × 0.4041 kgCO₂e/kWh ÷ 1,000

    = 3.39 tCO₂e

Assumptions used

  • Electricity rate: 0.45 AED / kWhSample assumptionIllustrative sample rate. Not a published tariff. Replace with the site's billed rate.
  • Grid electricity emission factor (Dubai): 0.4041 kgCO₂e / kWhPublished referenceDEWA Sustainability Report 2020, as indexed by Climatiq (AR4). Reference value from a 2020 publication. Confirm against DEWA's latest published factor before any real inventory.

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
Dubai South Facility · DS-FC
Asset
LC-12 — Loading bay lighting LC-12
Source ID
LC-12 · Lighting circuit
Source type
SENSOR / SIMULATED
Data quality
HIGH — SAMPLE
Detection resolution
ASSET / ZONE
Data limitation
Sample stream only. No live BMS or IoT connectivity.
Baseline window
30-day window
Intervention
LED retrofit, loading bays
Measurement window
30-day window
Before
41 kWh/night
After
18 kWh/night
Unit
Demand · kWh/night
Verification status
VERIFIED
Evidence
Lighting circuit LC-12

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Annualised from the 30-day sample meter window. AED uses the sample electricity rate; carbon uses the referenced Dubai grid factor. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency / asset-level M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    Loading-bay lighting remaining at occupied output.

  2. 02

    ANALYTICS

    41 kWh/night on LC-12.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    LED retrofit approved as a scheduled works item.

  5. 05

    APPROVAL

    Capex approved.

  6. 06

    ACTION

    Fitting completed.

  7. 07

    MEASUREMENT

    Thirty-day mean 18 kWh/night.

  8. 08

    VERIFICATION

    23 kWh/night avoided holds.

  9. 09

    IMPACT RECORD

    Impact record written to the ledger after verification.

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
Dubai South Facility · DS-FC
Asset
LC-12 — Loading bay lighting LC-12
Source ID
LC-12 · Lighting circuit
Source type
SENSOR / SIMULATED
Metric
Demand · kWh/night
Data quality
HIGH — SAMPLE
Detection resolution
ASSET / ZONE
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
Energy Baseline Engine
AI role
Interpretation / Prioritisation

Data limitation

  • Sample stream only. No live BMS or IoT connectivity.

NX-000201

VERIFIEDSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

AHU-07 unoccupied restore

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

AHU-07 unoccupied restore

JLT Operations Centre · AHU-07 energy channel

  1. 01 Before

    64 kWh overnight

    ↓

  2. 02 Action

    Unoccupied setback restored

    ↓

  3. 03 After

    18 kWh overnight

    ↓

  4. 04 Verified result

    AED 7,556

Reduction
16,790 kWh avoided · 6.78 tCO₂e avoided
Financial impact
AED 7,556
Evidence
AHU-07 energy channel
Confidence
92%
How this was calculatedShow working

Sample record. Quantities come from the sample meter window; values are derived as shown.

  1. 1. Energy avoided per year

    46 kWh/day × 365 days

    = 16,790 kWh

  2. 2. Financial value

    16,790 kWh × 0.45 AED/kWh

    = AED 7,556

  3. 3. Carbon avoided

    16,790 kWh × 0.4041 kgCO₂e/kWh ÷ 1,000

    = 6.78 tCO₂e

Assumptions used

  • Electricity rate: 0.45 AED / kWhSample assumptionIllustrative sample rate. Not a published tariff. Replace with the site's billed rate.
  • Grid electricity emission factor (Dubai): 0.4041 kgCO₂e / kWhPublished referenceDEWA Sustainability Report 2020, as indexed by Climatiq (AR4). Reference value from a 2020 publication. Confirm against DEWA's latest published factor before any real inventory.

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
JLT Operations Centre · JLT-OC
Asset
AHU-07 — AHU-07
Source ID
NEXUS Simulator
Source type
SIMULATOR
Data quality
HIGH — SAMPLE
Detection resolution
ASSET
Data limitation
Sample stream only. No live BMS or IoT connectivity.
Baseline window
14-day window
Intervention
Unoccupied setback restored
Measurement window
14-day window
Before
64 kWh overnight
After
18 kWh overnight
Unit
kWh
Verification status
VERIFIED
Evidence
AHU-07 energy channel

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Annualised from the 14-day sample meter window. AED uses the sample electricity rate; carbon uses the referenced Dubai grid factor. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency / asset-level M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    AHU-07 remaining in occupied mode after close.

  2. 02

    ANALYTICS

    64 kWh overnight locked.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    Restore weekday unoccupied setback from 20:00 GST.

  5. 05

    APPROVAL

    Schedule change approved.

  6. 06

    ACTION

    Setback restored by facilities.

  7. 07

    MEASUREMENT

    Fourteen-day mean 18 kWh overnight.

  8. 08

    VERIFICATION

    Avoided overnight cooling holds.

  9. 09

    IMPACT RECORD

    Impact record written to the ledger after verification.

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
JLT Operations Centre · JLT-OC
Asset
AHU-07 — AHU-07
Source ID
NEXUS Simulator
Source type
SIMULATOR
Metric
kWh
Data quality
HIGH — SAMPLE
Detection resolution
ASSET
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
Energy Baseline Engine
AI role
Interpretation / Prioritisation

Data limitation

  • Sample stream only. No live BMS or IoT connectivity.

NX-000218

VERIFIEDSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

Cooling-tower make-up trimmed

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Cooling-tower make-up trimmed

Business Bay HQ · Make-up meter MU-02

  1. 01 Before

    5,520 L/day make-up

    ↓

  2. 02 Action

    Blowdown setpoint corrected

    ↓

  3. 03 After

    3,680 L/day make-up

    ↓

  4. 04 Verified result

    AED 5,373

Reduction
671,600 L avoided
Financial impact
AED 5,373
Evidence
Make-up meter MU-02
Confidence
90%
How this was calculatedShow working

Sample record. Quantities come from the sample meter window; values are derived as shown.

  1. 1. Water avoided per year

    (5,520 − 3,680) L/day × 365 days

    = 671,600 L

  2. 2. Volume in cubic metres

    671,600 L ÷ 1,000

    = 671.6 m³

  3. 3. Financial value

    671.6 m³ × 8.00 AED/m³

    = AED 5,373

  4. 4. Carbon avoided

    Not calculated — no confirmed water emission factor

    = —

Assumptions used

  • Water rate: 8 AED / m³Sample assumptionIllustrative sample rate. Not a published tariff. Replace with the site's billed rate.
  • Water supply emission factor: noneNot availableNo confirmed published factor located. Carbon is not calculated for water records until a confirmed factor is supplied.

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
Business Bay HQ · BB-HQ
Asset
SITE LEVEL
Source ID
NEXUS Simulator
Source type
SIMULATOR
Data quality
HIGH — SAMPLE
Detection resolution
BUILDING / SITE
Data limitation
Site-level monthly data cannot localise the cause to a specific asset.
Baseline window
21-day window
Intervention
Blowdown setpoint corrected
Measurement window
21-day window
Before
5,520 L/day make-up
After
3,680 L/day make-up
Unit
L/hr
Verification status
VERIFIED
Evidence
Make-up meter MU-02

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Annualised from the 21-day sample make-up meter window. AED uses the sample water rate. Carbon not calculated: no confirmed water emission factor. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    Make-up remaining high after wet-bulb collapse.

  2. 02

    ANALYTICS

    5,520 L/day make-up on MU-02.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    Blowdown setpoint correction recommended.

  5. 05

    APPROVAL

    Plant operator approved.

  6. 06

    ACTION

    Setpoint written locally.

  7. 07

    MEASUREMENT

    Twenty-one-day mean 3,680 L/day.

  8. 08

    VERIFICATION

    1,840 L/day avoided holds.

  9. 09

    IMPACT RECORD

    Impact record written to the ledger after verification.

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
Business Bay HQ · BB-HQ
Asset
SITE LEVEL
Source ID
NEXUS Simulator
Source type
SIMULATOR
Metric
L/hr
Data quality
HIGH — SAMPLE
Detection resolution
BUILDING / SITE
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
Water Analytics Engine
AI role
Interpretation / Prioritisation

Data limitation

  • Site-level monthly data cannot localise the cause to a specific asset.
  • Additional sub-meter or BMS data is required to identify the responsible asset.
  • Sample stream only. No live BMS or IoT connectivity.

NX-000241

VERIFIEDSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

Generator warm-idle ended

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Generator warm-idle ended

Dubai South Facility · Generator log G-01

  1. 01 Before

    2.4 hours idle / week

    ↓

  2. 02 Action

    Test window locked to 25 minutes

    ↓

  3. 03 After

    0.4 hours / week

    ↓

  4. 04 Verified result

    AED 5,304

Reduction
4.71 tCO₂e avoided
Financial impact
AED 5,304
Evidence
Generator log G-01
Confidence
89%
How this was calculatedShow working

Sample record. Quantities come from the sample meter window; values are derived as shown.

  1. 1. Idle hours avoided per year

    (2.4 − 0.4) hours/week × 52 weeks

    = 104 hours

  2. 2. Diesel avoided

    104 hours × 17 litres/hour

    = 1,768 litres

  3. 3. Financial value

    1,768 litres × 3.00 AED/litre

    = AED 5,304

  4. 4. Carbon avoided

    1,768 litres × 2.66155 kgCO₂e/litre ÷ 1,000

    = 4.71 tCO₂e

Assumptions used

  • Generator idle fuel use: 17 litres / hourSample assumptionIllustrative sample asset parameter. Not measured. Replace with the generator's logged or rated idle consumption.
  • Diesel price: 3 AED / litreSample assumptionIllustrative sample price. Not a published price. Replace with the site's purchase price.
  • Diesel combustion emission factor: 2.66155 kgCO₂e / litrePublished referenceUK Government GHG Conversion Factors 2024, 100% mineral diesel (taken from a secondary reproduction). Not a UAE-specific factor. Confirm against the official publication and a locally accepted factor before real use.

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
Dubai South Facility · DS-FC
Asset
GEN-01 — Standby generator G-01
Source ID
NEXUS Simulator
Source type
SIMULATOR
Data quality
HIGH — SAMPLE
Detection resolution
ASSET
Data limitation
Sample stream only. No live BMS or IoT connectivity.
Baseline window
28-day window
Intervention
Test window locked to 25 minutes
Measurement window
28-day window
Before
2.4 hours idle / week
After
0.4 hours / week
Unit
hours
Verification status
VERIFIED
Evidence
Generator log G-01

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Annualised from the 28-day sample runtime log. Fuel use, diesel price are sample assumptions; carbon uses a referenced diesel factor. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency / asset-level M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    G-01 idling outside the authorised test window.

  2. 02

    ANALYTICS

    2.4 hours idle / week.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    Lock weekly test to 25 supervised minutes.

  5. 05

    APPROVAL

    Operations approved.

  6. 06

    ACTION

    Procedure updated.

  7. 07

    MEASUREMENT

    Four-week mean 0.4 hours / week.

  8. 08

    VERIFICATION

    Idle carbon holds as avoided.

  9. 09

    IMPACT RECORD

    Impact record written to the ledger after verification.

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
Dubai South Facility · DS-FC
Asset
GEN-01 — Standby generator G-01
Source ID
NEXUS Simulator
Source type
SIMULATOR
Metric
hours
Data quality
HIGH — SAMPLE
Detection resolution
ASSET
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
Derived carbon impact from sample-ledger electricity and fuel records × listed factors
AI role
Interpretation / Prioritisation

Data limitation

  • Sample stream only. No live BMS or IoT connectivity.

NX-000176

MEASURINGSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

Break-pack bin split

VERIFIED SAMPLE IMPACT

SAMPLE DATAMEASURING

Break-pack bin split

Al Quoz Warehouse · Weighbridge WB-03

  1. 01 Before

    38% contamination

    ↓

  2. 02 Action

    Break-pack bin split

    ↓

  3. 03 After

    24% contamination

    ↓

  4. 04 Verified result

    AED 4,200

Reduction
Pending
Financial impact
AED 4,200
Evidence
Weighbridge WB-03
Confidence
81%

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
Al Quoz Warehouse · AQ-WH
Asset
WB-03 — Weighbridge WB-03
Source ID
WB-03 · Weighbridge
Source type
SENSOR / SIMULATED
Data quality
HIGH — SAMPLE
Detection resolution
ASSET
Data limitation
Sample stream only. No live BMS or IoT connectivity.
Baseline window
21-day window
Intervention
Break-pack bin split
Measurement window
21-day window
Before
38% contamination
After
24% contamination
Unit
Mass · %
Verification status
MEASURING
Evidence
Weighbridge WB-03

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Measuring. Not included in verified totals. Carbon not calculated: no confirmed waste factor. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency / asset-level M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    Contamination +19 pts on mixed recyclables.

  2. 02

    ANALYTICS

    38% contamination at WB-03.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    Split the break-pack bin pair.

  5. 05

    APPROVAL

    Warehouse lead approved.

  6. 06

    ACTION

    Bins split.

  7. 07

    MEASUREMENT

    Window still open. 24% so far.

  8. 08

    VERIFICATION

    Not reached

  9. 09

    IMPACT RECORD

    Not reached

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
Al Quoz Warehouse · AQ-WH
Asset
WB-03 — Weighbridge WB-03
Source ID
WB-03 · Weighbridge
Source type
SENSOR / SIMULATED
Metric
Mass · %
Data quality
HIGH — SAMPLE
Detection resolution
ASSET
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
NEXUS domain services
AI role
Not commissioned — display only

Data limitation

  • Sample stream only. No live BMS or IoT connectivity.

NX-000151

UNVERIFIEDSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

Irrigation schedule tightened

VERIFIED SAMPLE IMPACT

SAMPLE DATAUNVERIFIED

Irrigation schedule tightened

Business Bay HQ · Irrigation controller IC-04

  1. 01 Before

    6,400 L/day landscape

    ↓

  2. 02 Action

    Irrigation schedule tightened

    ↓

  3. 03 After

    Pending post-measure

    ↓

  4. 04 Verified result

    AED —

Reduction
Pending
Financial impact
AED —
Evidence
Irrigation controller IC-04
Confidence
74%

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
Business Bay HQ · BB-HQ
Asset
SITE LEVEL
Source ID
IC-04 · Irrigation controller
Source type
SENSOR / SIMULATED
Data quality
HIGH — SAMPLE
Detection resolution
BUILDING / SITE
Data limitation
Site-level monthly data cannot localise the cause to a specific asset.
Baseline window
7-day window
Intervention
Irrigation schedule tightened
Measurement window
7-day window
Before
6,400 L/day landscape
After
Pending post-measure
Unit
Volume · L/day
Verification status
UNVERIFIED
Evidence
Irrigation controller IC-04

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Unverified. Controller currently offline. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    Landscape flow not tracking the dry-bulb drop.

  2. 02

    ANALYTICS

    6,400 L/day landscape.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    Tighten night irrigation window.

  5. 05

    APPROVAL

    Not reached

  6. 06

    ACTION

    Not reached

  7. 07

    MEASUREMENT

    Not reached

  8. 08

    VERIFICATION

    Not reached

  9. 09

    IMPACT RECORD

    Not reached

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
Business Bay HQ · BB-HQ
Asset
SITE LEVEL
Source ID
IC-04 · Irrigation controller
Source type
SENSOR / SIMULATED
Metric
Volume · L/day
Data quality
HIGH — SAMPLE
Detection resolution
BUILDING / SITE
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
Water Analytics Engine
AI role
Interpretation / Prioritisation

Data limitation

  • Site-level monthly data cannot localise the cause to a specific asset.
  • Additional sub-meter or BMS data is required to identify the responsible asset.
  • Sample stream only. No live BMS or IoT connectivity.

NX-000140

REJECTEDSAMPLE DATANOT ACTUAL CUSTOMER SAVINGS

Single-use catering swap trial

VERIFIED SAMPLE IMPACT

SAMPLE DATAREJECTED

Single-use catering swap trial

JLT Operations Centre · Procurement log PR-77110

  1. 01 Before

    PET units 4,200/month

    ↓

  2. 02 Action

    Reusable service trial

    ↓

  3. 03 After

    No statistically valid window

    ↓

  4. 04 Verified result

    AED —

Reduction
Insufficient evidence
Financial impact
AED —
Evidence
Procurement log PR-77110
Confidence
41%

NOT ACTUAL CUSTOMER SAVINGS

Organisation
NEXUS Reference Portfolio
Site
JLT Operations Centre · JLT-OC
Asset
SITE LEVEL
Source ID
NEXUS Simulator
Source type
SIMULATOR
Data quality
HIGH — SAMPLE
Detection resolution
BUILDING / SITE
Data limitation
Site-level monthly data cannot localise the cause to a specific asset.
Baseline window
14-day window
Intervention
Reusable service trial
Measurement window
14-day window
Before
PET units 4,200/month
After
No statistically valid window
Unit
units
Verification status
REJECTED
Evidence
Procurement log PR-77110

Measurement & Verification · IPMVP-aligned workflow · baseline methodology. Rejected. Sample too small for verification. Sample data. Not IPMVP certified. Not a completed third-party verification.

IPMVP-aligned workflow · higher-frequency M&V. Not IPMVP certified.

Evidence journey

  1. 01

    DETECTION

    Single-use PET volume in catering PR.

  2. 02

    ANALYTICS

    4,200 units / month.

  3. 03

    INTERPRETATION

    Finding reviewed against operating context. Sample record; no AI model produced this step.

  4. 04

    RECOMMENDATION

    Reusable trial proposed.

  5. 05

    APPROVAL

    Trial approved.

  6. 06

    ACTION

    Trial started.

  7. 07

    MEASUREMENT

    Insufficient observations.

  8. 08

    VERIFICATION

    Not reached

  9. 09

    IMPACT RECORD

    Not reached

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
JLT Operations Centre · JLT-OC
Asset
SITE LEVEL
Source ID
NEXUS Simulator
Source type
SIMULATOR
Metric
units
Data quality
HIGH — SAMPLE
Detection resolution
BUILDING / SITE
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
NEXUS domain services
AI role
Not commissioned — display only

Data limitation

  • Site-level monthly data cannot localise the cause to a specific asset.
  • Additional sub-meter or BMS data is required to identify the responsible asset.
  • Sample stream only. No live BMS or IoT connectivity.