Actual demand
428 kW
Expected
371 kW
Deviation
+15.4%
01 Data
What is happening?
02 Analysis
What is wrong and why?
03 Solution
What should be done?
04 Impact
What changed and can we prove it?
Data context
Facility intelligence topology
01 Data
What is happening?
Energy load envelope
CH-Z4 — Zone 4 cooling plant · SM2044 · Simulated Smart Meter
Actual
428 kW
Expected
371 kW
Deviation
+15.4%
02 Analysis
What is wrong and why?
Load deviation
Confirmed
Attention
Expected envelope
Exceeded
Actual 428 kW versus expected 371 kW.
Baseline deviation
+15.4%
CH-Z4 — Zone 4 cooling plant
Operating pattern
Outside expected range
Zone 4 cooling continues above the expected envelope.
Data quality
High — Sample
SM2044 · Simulated Smart Meter
Detection resolution
Asset / Zone
CH-Z4 — Zone 4 cooling plant
Where this data comes from
Data lineage
SAMPLE DATA
Data limitation
03 Solution
What should be done?
Primary action
Zone cooling continues despite low occupancy.
01 Review
Review Zone 4 cooling load against the expected envelope.
02 Confirm occupancy
Confirm occupancy and schedule context for the deviation window.
03 Adjust
Reduce Zone 4 cooling operation between 15:00–17:30.
04 Confirm
Confirm the schedule change on the cooling plant.
05 Measure
Compare post-action demand against the 371 kW expected load.
06 Verify
Record evidence-backed before/after comparison in the Impact Ledger.
NEXUS recommends; people approve and carry out the work. NEXUS does not control equipment.
04 Impact
What changed and can we prove it?
Potential
AED 17,740 sample potential from ranked energy cases
A projection from the gap to baseline. Nothing has been achieved yet.
Measuring
Requires approved action and measurement
Action carried out. The before/after measurement window is still open.
Verified
AED 4,763
Measurement window closed with evidence attached. Sample records, not customer savings.
VERIFIED SAMPLE IMPACT
SAMPLE DATAVERIFIEDBusiness Bay HQ · Smart Meter SM2044
01 Before
178 kWh/day
↓
02 Action
Cooling schedule corrected
↓
03 After
149 kWh/day
↓
04 Verified result
AED 4,763
Sample record. Quantities come from the sample meter window; values are derived as shown.
1. Energy avoided per year
29 kWh/day × 365 days
= 10,585 kWh
2. Financial value
10,585 kWh × 0.45 AED/kWh
= AED 4,763
3. Carbon avoided
10,585 kWh × 0.4041 kgCO₂e/kWh ÷ 1,000
= 4.28 tCO₂e
Assumptions used
NOT ACTUAL CUSTOMER SAVINGS
NOT ACTUAL CUSTOMER SAVINGS
Data maturity
REAL-TIME SIMULATION
Source: NEXUS Simulator. Integration: SIMULATED. Not live IoT connectivity.
NEXUS ZERO is designed to work with the data an organisation already has, with deeper analysis as data maturity improves.
No new sensor installation is required by the design. The depth of analysis depends on how often data arrives.
Source types in the data model
Utility bills · Manual meter readings · CSV · API · BMS / EMS / CMMS · Smart meter · IoT sensor
Not yet built: file upload, utility-bill import and live connectors to building systems.
MANUAL
Utility bills, manual readings, spreadsheets
↓
PERIODIC
Scheduled meter exports, CSV, monthly/weekly data
↓
CONNECTED
API, BMS/EMS/CMMS integration, smart meters
↓
REAL-TIME
High-frequency meters/sensors
↓
AUTONOMOUS-READY
Governed control integration and verified write-back capability