Floor energy meter
Asset CH-Z4 — Zone 4 cooling plant · Zone Zone 4 · Demand (kW) · Energy (kWh)
SMART METER / SIMULATED METER · SIMULATED
NEXUS Reference Portfolio
Dubai / GST —:—:—
Site
Complete facility story: data, analysis, recommended solutions and verified sample impact.
SAMPLE DATA MODE
01 Data
What is happening?
02 Analysis
What is wrong and why?
03 Solution
What should be done?
04 Impact
What changed and can we prove it?
Data context
BB-HQ
REFERENCE FACILITYSAMPLE DATABusiness Bay, Dubai, UAE
A sensor is optional. A traceable data source is mandatory. SIMULATED — NO LIVE BMS / IOT CONNECTION. Future feeds (BACnet · Modbus · MQTT · API · CSV · utility meter feeds — SUPPORTED / PLANNED, not ACTIVE).
Site resource fingerprint
Energy
attentionWater
criticalWhere this data comes from
Data lineage
SAMPLE DATA
Data limitation
Building
Headquarters · Business Bay, Dubai, UAE
Data sources
SM2044
Asset CH-Z4 — Zone 4 cooling plant · Zone Zone 4 · Demand (kW) · Energy (kWh)
SMART METER / SIMULATED METER · SIMULATED
SM1182
Asset WR-L18 — L18 domestic water riser · Zone L18 · Water Flow (L/hr) · Volume (L)
SMART METER / SIMULATED METER · SIMULATED
IC-04
Asset SITE LEVEL · Zone SITE · Volume (L)
SENSOR / SIMULATED · SIMULATED
Assets
CH-Z4
Cooling · Attention · BB-HQ-MAIN
WR-L18
Water · Critical · BB-HQ-MAIN
Metrics
NOT ACTUAL CUSTOMER SAVINGS
Open analysis
water
Ready for decision · AED 38,124 potential · POTENTIAL IMPACT · NOT YET ACHIEVED
energy
Ready for decision · AED 5,749 potential · POTENTIAL IMPACT · NOT YET ACHIEVED
energy
Ready for decision · AED 1,971 potential · POTENTIAL IMPACT · NOT YET ACHIEVED
03 Solution
What should be done?
Primary action
Sustained flow after occupancy collapse. Pattern matches a bypassed isolation valve on the L18 riser.
01 Inspect
Inspect the L18 riser and night-flush valve for continuous abnormal flow.
02 Isolate
Isolate the L18 riser so the residual stream can be confirmed.
03 Confirm
Confirm meter SM1182 after isolation.
04 Correct
Correct the identified isolation or fixture issue.
05 Measure
Compare post-action flow against the 2,210 L/hr baseline.
06 Verify
Record evidence-backed before/after comparison in the Impact Ledger.
NEXUS recommends; people approve and carry out the work. NEXUS does not control equipment.
Interventions
Abnormal overnight flow detected at Business Bay HQ.
DETECTED
Cooling demand is 24.5% above the expected requirement.
INVESTIGATING
Perimeter lighting at Business Bay remaining at occupied output after 20:00 GST.
DETECTED
Impact / evidence
VERIFIED SAMPLE IMPACT
SAMPLE DATAVERIFIEDBusiness Bay HQ · Smart Meter SM2044
01 Before
178 kWh/day
↓
02 Action
Cooling schedule corrected
↓
03 After
149 kWh/day
↓
04 Verified result
AED 4,763
Sample record. Quantities come from the sample meter window; values are derived as shown.
1. Energy avoided per year
29 kWh/day × 365 days
= 10,585 kWh
2. Financial value
10,585 kWh × 0.45 AED/kWh
= AED 4,763
3. Carbon avoided
10,585 kWh × 0.4041 kgCO₂e/kWh ÷ 1,000
= 4.28 tCO₂e
Assumptions used
NOT ACTUAL CUSTOMER SAVINGS
VERIFIED SAMPLE IMPACT
SAMPLE DATAVERIFIEDBusiness Bay HQ · Make-up meter MU-02
01 Before
5,520 L/day make-up
↓
02 Action
Blowdown setpoint corrected
↓
03 After
3,680 L/day make-up
↓
04 Verified result
AED 5,373
Sample record. Quantities come from the sample meter window; values are derived as shown.
1. Water avoided per year
(5,520 − 3,680) L/day × 365 days
= 671,600 L
2. Volume in cubic metres
671,600 L ÷ 1,000
= 671.6 m³
3. Financial value
671.6 m³ × 8.00 AED/m³
= AED 5,373
4. Carbon avoided
Not calculated — no confirmed water emission factor
= —
Assumptions used
NOT ACTUAL CUSTOMER SAVINGS
VERIFIED SAMPLE IMPACT
SAMPLE DATAUNVERIFIEDBusiness Bay HQ · Irrigation controller IC-04
01 Before
6,400 L/day landscape
↓
02 Action
Irrigation schedule tightened
↓
03 After
Pending post-measure
↓
04 Verified result
AED —