Data context
BB-HQ
REFERENCE FACILITYSAMPLE DATABusiness Bay, Dubai, UAE
A sensor is optional. A traceable data source is mandatory. SIMULATED — NO LIVE BMS / IOT CONNECTION. Future feeds (BACnet · Modbus · MQTT · API · CSV · utility meter feeds — SUPPORTED / PLANNED, not ACTIVE).
Site resource fingerprint
Energy
attentionWater
criticalWhere this data comes from
Data lineage
SAMPLE DATA
Data limitation
Building
Headquarters · Business Bay, Dubai, UAE
Data sources
SM2044
Asset CH-Z4 — Zone 4 cooling plant · Zone Zone 4 · Demand (kW) · Energy (kWh)
SMART METER / SIMULATED METER · SIMULATED
SM1182
Asset WR-L18 — L18 domestic water riser · Zone L18 · Water Flow (L/hr) · Volume (L)
SMART METER / SIMULATED METER · SIMULATED
IC-04
Asset SITE LEVEL · Zone SITE · Volume (L)
SENSOR / SIMULATED · SIMULATED
Assets
CH-Z4
Cooling · Attention · BB-HQ-MAIN
WR-L18
Water · Critical · BB-HQ-MAIN
Metrics
NOT ACTUAL CUSTOMER SAVINGS
Open analysis
water
Ready for decision · AED 11,200 potential · POTENTIAL IMPACT · NOT YET ACHIEVED
energy
Ready for decision · AED 4,180 potential · POTENTIAL IMPACT · NOT YET ACHIEVED
energy
Ready for decision · AED 2,400 potential · POTENTIAL IMPACT · NOT YET ACHIEVED
03 Solution
What should be done?
Primary action
Sustained flow after occupancy collapse. Pattern matches a bypassed isolation valve on the L18 riser.
01 Inspect
Inspect the L18 riser and night-flush valve for continuous abnormal flow.
02 Isolate
Isolate the L18 riser so the residual stream can be confirmed.
03 Confirm
Confirm meter SM1182 after isolation.
04 Correct
Correct the identified isolation or fixture issue.
05 Measure
Compare post-action flow against the 2,210 L/hr baseline.
06 Verify
Record evidence-backed before/after comparison in the Impact Ledger.
Level 3 physical control remains locked. NEXUS does not command equipment.
Interventions
Abnormal overnight flow detected at Business Bay HQ.
DETECTED
Cooling demand is 21% above predicted requirement.
INVESTIGATING
Perimeter lighting at Business Bay remaining at occupied output after 20:00 GST.
DETECTED
Impact / evidence
VERIFIED SAMPLE IMPACT
SAMPLE DATAVERIFIEDBusiness Bay HQ · Smart Meter SM2044
01 Before
178 kWh/day
↓
02 Action
Cooling schedule corrected
↓
03 After
149 kWh/day
↓
04 Verified result
AED 4,760
NOT ACTUAL CUSTOMER SAVINGS
VERIFIED SAMPLE IMPACT
SAMPLE DATAVERIFIEDBusiness Bay HQ · Make-up meter MU-02
01 Before
920 L/hr make-up
↓
02 Action
Blowdown setpoint corrected
↓
03 After
610 L/hr make-up
↓
04 Verified result
AED 11,200
NOT ACTUAL CUSTOMER SAVINGS
VERIFIED SAMPLE IMPACT
SAMPLE DATAUNVERIFIEDBusiness Bay HQ · Irrigation controller IC-04
01 Before
6,400 L/day landscape
↓
02 Action
Irrigation schedule tightened
↓
03 After
Pending post-measure
↓
04 Verified result
AED —
NOT ACTUAL CUSTOMER SAVINGS