SM0881
Overnight water meter
Asset SITE LEVEL · Zone SITE · Water Flow (L/hr) · Volume (L)
SMART METER / SIMULATED METER · SIMULATED
NEXUS Reference Portfolio
Dubai / GST —:—:—
Site
Complete facility story: data, analysis, recommended solutions and verified sample impact.
SAMPLE DATA MODE
01 Data
What is happening?
02 Analysis
What is wrong and why?
03 Solution
What should be done?
04 Impact
What changed and can we prove it?
Data context
JLT-OC
REFERENCE FACILITYSAMPLE DATAJumeirah Lakes Towers, Dubai, UAE
A sensor is optional. A traceable data source is mandatory. SIMULATED — NO LIVE BMS / IOT CONNECTION. Future feeds (BACnet · Modbus · MQTT · API · CSV · utility meter feeds — SUPPORTED / PLANNED, not ACTIVE).
Site resource fingerprint
Energy
stableWater
attentionWhere this data comes from
Data lineage
SAMPLE DATA
Data limitation
Building
Operations Centre · Jumeirah Lakes Towers, Dubai, UAE
Data sources
SM0881
Asset SITE LEVEL · Zone SITE · Water Flow (L/hr) · Volume (L)
SMART METER / SIMULATED METER · SIMULATED
Assets
AHU-07
Cooling · Attention · JLT-OC-MAIN
Metrics
NOT ACTUAL CUSTOMER SAVINGS
Open analysis
energy
Ready for decision · AED 6,900 potential · POTENTIAL IMPACT · NOT YET ACHIEVED
03 Solution
What should be done?
Primary action
Schedule exception left in place after weekend event.
01 Review
Review Zone 4 cooling load against the expected envelope.
02 Confirm occupancy
Confirm occupancy and schedule context for the deviation window.
03 Adjust
Reduce Zone 4 cooling operation between 15:00–17:30.
04 Confirm
Confirm the schedule change on the cooling plant.
05 Measure
Compare post-action demand against the 371 kW expected load.
06 Verify
Record evidence-backed before/after comparison in the Impact Ledger.
Level 3 physical control remains locked. NEXUS does not command equipment.
Interventions
Air handling unit AHU-07 remaining in occupied mode after close.
DETECTED
Impact / evidence
VERIFIED SAMPLE IMPACT
SAMPLE DATAVERIFIEDJLT Operations Centre · Sub-meter SM0881
01 Before
1,960 L/hr overnight
↓
02 Action
Night-flush valve isolated
↓
03 After
410 L/hr overnight
↓
04 Verified result
AED 9,840
NOT ACTUAL CUSTOMER SAVINGS
VERIFIED SAMPLE IMPACT
SAMPLE DATAVERIFIEDJLT Operations Centre · AHU-07 energy channel
01 Before
64 kWh overnight
↓
02 Action
Unoccupied setback restored
↓
03 After
18 kWh overnight
↓
04 Verified result
AED 6,900
NOT ACTUAL CUSTOMER SAVINGS
VERIFIED SAMPLE IMPACT
SAMPLE DATAREJECTEDJLT Operations Centre · Procurement log PR-77110
01 Before
PET units 4,200/month
↓
02 Action
Reusable service trial
↓
03 After
No statistically valid window
↓
04 Verified result
AED —
NOT ACTUAL CUSTOMER SAVINGS