WORKING / DEPLOYED
Sample data

Site

Dubai South Facility

Complete facility story: data, analysis, recommended solutions and verified sample impact.

SAMPLE DATA MODE

  1. 01 Data

    What is happening?

  2. 02 Analysis

    What is wrong and why?

  3. 03 Solution

    What should be done?

  4. 04 Impact

    What changed and can we prove it?

All sitesSAMPLE DATAREFERENCE FACILITY

Data context

Organisation
NEXUS Reference Portfolio
Site
Dubai South Facility · DS-FC
Building
DS-FC-MAIN · Facility
Location
Dubai South, Dubai, UAE
Asset
Site register
Data source / Meter
NEXUS Simulator
Metric
Energy · Water
Unit
kW · L/hr
Resolution
Site to asset / zone
Data quality
HIGH — SAMPLE
Integration
Simulated — No live BMS / IoT
Data mode
Sample

DS-FC

REFERENCE FACILITYSAMPLE DATA

Dubai South Facility

Dubai South, Dubai, UAE

Site name
Dubai South Facility
Site ID
DS-FC
Location
Dubai South
Emirate
Dubai
Country
UAE
Premise / facility type
Facility
Building ID
DS-FC-MAIN
Data mode
DEMO
Integration status
SIMULATED — NO LIVE BMS / IOT CONNECTION
Data source
NEXUS Simulator
Data maturity
REAL-TIME SIMULATION
Data quality
HIGH — SAMPLE
Connected assets
2
Connected sources
1
Open opportunities
1
Active interventions
1
Verified sample records
2

A sensor is optional. A traceable data source is mandatory. SIMULATED — NO LIVE BMS / IOT CONNECTION. Future feeds (BACnet · Modbus · MQTT · API · CSV · utility meter feeds — SUPPORTED / PLANNED, not ACTIVE).

Site resource fingerprint

Energy

stable

Water

stable
Open issues
1
Data coverage
HIGH
Sources
1
Resolution
ASSET / ZONE
Verified sample records
2
Verified sample value
AED 9,082
NOT ACTUAL CUSTOMER SAVINGS

Where this data comes from

Data lineage

SAMPLE DATA

Organisation
NEXUS Reference Portfolio
Site
Dubai South Facility · DS-FC
Asset
LC-12 — Loading bay lighting LC-12
Source ID
LC-12 · Lighting circuit
Source type
SENSOR / SIMULATED
Metric
Energy · kWh
Data quality
HIGH — SAMPLE
Detection resolution
ASSET / ZONE
Source
NEXUS Simulator
Stored in
Railway PostgreSQL
Analysis
Energy Baseline Engine
AI role
Interpretation / Prioritisation

Data limitation

  • Sample stream only. No live BMS or IoT connectivity.

Building

DS-FC-MAIN

Facility · Dubai South, Dubai, UAE

Data sources

LC-12

Lighting circuit

Asset LC-12 — Loading bay lighting LC-12 · Zone Loading bay · Demand (kW) · Energy (kWh)

SMART METER / SIMULATED METER · SIMULATED

Assets

GEN-01

Standby generator G-01

Power · Stable · DS-FC-MAIN

LC-12

Loading bay lighting LC-12

Lighting · Verified · DS-FC-MAIN

Metrics

Energy
132 kW
Water
410 L/hr
Open issues
1
Sample ledger value
AED 9,082

NOT ACTUAL CUSTOMER SAVINGS

Open analysis

carbon

Generator warm-idle beyond window

Preview recommendation · AED 5,304 potential · POTENTIAL IMPACT · NOT YET ACHIEVED

Interventions

Ranked operational cases

DERIVEDCARBON IMPACT
Site
Dubai South Facility · DS-FC
Building / asset
GEN-01 — Standby generator G-01
Data source
NEXUS Simulator
Metric
Idle hours · hours
Sample / real status
SAMPLE DATA

Standby generator at Dubai South idling outside the test window.

Confidence
89%
Observed
2.4 hours idle
Expected
0.4 hour test window

DERIVED CARBON IMPACT

Impact / evidence

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

LED retrofit, loading bays

Dubai South Facility · Lighting circuit LC-12

  1. 01 Before

    41 kWh/night

    ↓

  2. 02 Action

    LED retrofit, loading bays

    ↓

  3. 03 After

    18 kWh/night

    ↓

  4. 04 Verified result

    AED 3,778

Reduction
8,395 kWh avoided · 3.39 tCO₂e avoided
Financial impact
AED 3,778
Evidence
Lighting circuit LC-12
Confidence
97%
How this was calculatedShow working

Sample record. Quantities come from the sample meter window; values are derived as shown.

  1. 1. Energy avoided per year

    23 kWh/day × 365 days

    = 8,395 kWh

  2. 2. Financial value

    8,395 kWh × 0.45 AED/kWh

    = AED 3,778

  3. 3. Carbon avoided

    8,395 kWh × 0.4041 kgCO₂e/kWh ÷ 1,000

    = 3.39 tCO₂e

Assumptions used

  • Electricity rate: 0.45 AED / kWhSample assumptionIllustrative sample rate. Not a published tariff. Replace with the site's billed rate.
  • Grid electricity emission factor (Dubai): 0.4041 kgCO₂e / kWhPublished referenceDEWA Sustainability Report 2020, as indexed by Climatiq (AR4). Reference value from a 2020 publication. Confirm against DEWA's latest published factor before any real inventory.

NOT ACTUAL CUSTOMER SAVINGS

VERIFIED SAMPLE IMPACT

SAMPLE DATAVERIFIED

Generator warm-idle ended

Dubai South Facility · Generator log G-01

  1. 01 Before

    2.4 hours idle / week

    ↓

  2. 02 Action

    Test window locked to 25 minutes

    ↓

  3. 03 After

    0.4 hours / week

    ↓

  4. 04 Verified result

    AED 5,304

Reduction
4.71 tCO₂e avoided
Financial impact
AED 5,304
Evidence
Generator log G-01
Confidence
89%
How this was calculatedShow working

Sample record. Quantities come from the sample meter window; values are derived as shown.

  1. 1. Idle hours avoided per year

    (2.4 − 0.4) hours/week × 52 weeks

    = 104 hours

  2. 2. Diesel avoided

    104 hours × 17 litres/hour

    = 1,768 litres

  3. 3. Financial value

    1,768 litres × 3.00 AED/litre

    = AED 5,304

  4. 4. Carbon avoided

    1,768 litres × 2.66155 kgCO₂e/litre ÷ 1,000

    = 4.71 tCO₂e

Assumptions used

  • Generator idle fuel use: 17 litres / hourSample assumptionIllustrative sample asset parameter. Not measured. Replace with the generator's logged or rated idle consumption.
  • Diesel price: 3 AED / litreSample assumptionIllustrative sample price. Not a published price. Replace with the site's purchase price.
  • Diesel combustion emission factor: 2.66155 kgCO₂e / litrePublished referenceUK Government GHG Conversion Factors 2024, 100% mineral diesel (taken from a secondary reproduction). Not a UAE-specific factor. Confirm against the official publication and a locally accepted factor before real use.

NOT ACTUAL CUSTOMER SAVINGS